The company Siegler from Bürstadt gave a particular appearance to a dental practice in Hofheim.
A total of about 70 m² was covered with selfmade constructions of shiplap panels in titanium silver. A substructure and aluminum spacer profile had been previously assembled. One special feature of this project is the integrated oculus (with a diameter of 2 meters). The total construction period amounted to ca. 2 weeks.